Emergency power supply car using procedures

1. When the emergency power car is in the parked state, use the two left and right exhaust doors on the front of the compartment to hook up and fix the upper door, and then lift the door to the upper part of the compartment and put the hydraulic support down. .

2. Open the back of the vehicle compartment and double open the door. First remove the load cable above the cable winch, place the other end of the computer on the desired destination, connect the load devices, and then connect the other end of the computer. The quick plug and the emergency power car have good load output connections. Then confirm that the output of the connection phase sequence is connected correctly, and is to do a good job of grounding, if it does not have a grounding point, you can put the grounding pile with the car to the ground, you can make a reliable zero-hour grounding point.

3. Use the hooks to fix the right access door of the emergency power supply car and the operation door, and check that the antifreeze in the vehicle generator oil and the generator set is in good condition. Check the voltage of the battery and the amount of fuel in the fuel tank is good, and then close the switch of the vehicle battery, and further confirm that careful inspection of the output load air is not shut off.

4. If the above inspection conditions are all normal, the user can select the self-starting starter motor group according to the actual situation of his own site, such as: automatic shutdown of the parallel operation and automatic operation of the stand-alone operation.

5. When the emergency power supply vehicle is in running state, it is normal to check the AC current of the vehicle at a regular time. Observe carefully the current difference between each phase sequence. Remember that it is best not to be high. At 10%. It is also necessary to regularly check whether the voltage is in the normal use range, and check whether the engine speed of the emergency power car is at a normal speed. From time to time, it is necessary to notice whether the generator's engine has vibrated and abnormally sounded. If there is an emergency, you must press the emergency button to stop it.

6. After the emergency power supply vehicle is used, open the right control operation door, close the load switch, and press the stop button. The switch of the oil machine is automatically opened. After waiting for no-load operation of the vehicle's standby group to cool down, the generator unit is automatically shut down. Finally, the emergency stop switch is pressed to remove the load-connected cable. The manual and automatic methods are used. Let the cable winch carefully and evenly wind the load cable on the top, use the hook to sit at the top of the terminal to fix the work, close all the doors and windows, and lock the hydraulic power of the emergency power car.

Vertical Dock Leveler

Vertical Dock Leveler,Stationary Dock Leveler,Blue Vertical Dock Leveler,Engine Load Leveler

Porema (Suzhou) Logistics Machinery and Equipment Co., LTD , https://www.jsporema.com

Posted on