(1 ) Before the blind shaft is drilled down, a counter-well must be drilled upward from the roadway at the stage or the top of the flat roof at the predetermined position of the blind shaft.
A sky wheel platform is installed in the anti-well to install the lifting sky wheel and the stable rope wheel; a slag discharging platform and a chute are installed in the lower part of the counter-well, and the waste rock used for blind shaft drilling is turned into the mine car.
The height of the counter-well must meet the requirements of the safety regulations for the height of the over-roll, generally required ! $ % "&' (from the floor level of the roadway).
( 2 ) The arrangement and suspension of the chiseling equipment is more difficult. The sinking equipment and pipelines are preferably suspended in the well, that is, the pipeline card is in the blind shaft; when the steel rope is suspended, the ground wheel should be suspended as much as possible. The ground wheel is placed on the well cover plate. , thereby simplifying the arrangement of the day wheel and reducing the setting of the pressure wheel. The hoist and the stable winch are arranged as far as possible at the joint of the blind shaft and the roadway (or flat), and are arranged on one side or on both sides. When necessary (such as when the blind shaft is a single-sided horsehead), a temporary diverticulum should be cut on the opposite side; sometimes the ropeway for lifting the steel rope is to be drilled.
( 3 ) In the predetermined position of the blind shaft, it is also necessary to cut a section from the roadway or the flat floor to the neck, deeper than 10m , and install the manhole cover, fixed plate and hanging plate in the neck. The construction of the well neck is low in mechanization and the construction speed is slow.
( 4 ) After the completion of the above-mentioned counter-well, temporary works and well neck construction, install various construction platforms, construction equipment and facilities, and hang various pipelines and sinking machinery (such as rock grabber, crane pump, drill) frame). After that, the blind shaft can be drilled down. The construction process is the same as that of the shaft construction. The only difference is that the lifting, ventilation, drainage, and cutting are all required and affected by the roadway (or flat) in the mining stage, so the construction speed is generally lower than that of the shaft. Therefore, the degree of mechanized equipment for blind shaft construction should not be too high.
The scheme of construction of blind shaft from top to bottom has shortcomings such as long preparation period and complicated preparation work. However, compared with the bottom-up construction scheme, the construction mechanization is relatively high, so it is suitable for deep and reverse blind shafts. Under the condition that the well construction is very difficult, it is especially suitable for mines that are jointly developed with flat and blind shafts.
Rope Ladders
Rope ladders are ladders which are made from two long, parallel ropes which are connected with short steps. Those steps are made from various materials, wood, iron tubes, aluminium , or even rope.
The rope ladder has no length limited, soft convenient in transportation lightweight and other features. The main benefit of rope ladders, is the possibility to roll them and to carry them in this compact, barrel like form.
The overall framework for the rope ladder , two side ropes using weave , disposable braided rope into H -type right to wear crosspiece were woven into the side of the lower end of its rope into shaping.
Crosspiece using round ( square ) epoxy pipe . The use of safe and reliable. Ladder length limit has not , soft , easy to transport , the use of lightweight characteristics ; has cored nylon rope ladder ,rope ladder , insulation ladder, with protective ladder ; insulation ladder using silkworm silk cord or nylon rope weaving, down tube insulation tube , especially for electricity live working construction; rope ladder pull 500kg, insulation ladder pull 300kg.
Features:
1.Material: polyester resin tube
2.Load capacity: 350 kg
3.Acid resistance: high
4.Anti-alkali: high
5.Life time:5-6 year
Instructions:
Rope ladders are ladders which are made from two long, parallel ropes which are connected with short steps.
Those steps are made from various materials, wood, iron tubes, aluminium, or even rope.
The main benefit of rope ladders, is the possibility to roll them and to carry them in this compact, barrel like form
3 Insulated soft ladder with 20m
Safety Rope Ladder Main Parameter
Color:
white or can be customized
Rope Material :S
Silk / Nylon / Poly amide rope and so on
Rung Material:
Wood rung or FRP rung
Width:
32cm
Length:
10m.15m.20m.30m.40m.50m or can be customized
Load capacity:
350 kg
Package:
Carton package or bags package
Life time:
5-6years
Rope-Ladder,Rope Folding Ladder,Climbing Rope Ladder,Boat Rope Ladder
Hebei Liston Lifting Rigging Manufacturing Co., Ltd. , https://www.liftingriggingfactory.com