After the crushing cone or the lining of the frame is worn, in order to ensure the size of the ore discharge, it is necessary to restore the original venting width. The adjustment method is to increase the crushing cone and reduce the discharge port. If the crushing cone has been raised to the apex and the discharge opening is not restored to its original width, then the replacement of the rack or the shredded liner should be considered or replaced at the same time. When raising the crushing cone, first remove the nut on the beam, then screw the lifting ring into the wire hole at the upper end of the crushing cone main shaft, and then use the crane to lift the crushing cone. The height of the lifting should be higher than originally expected. The increased distance is 5-15 mm higher.
After the crushing cone is lifted, turn the adjusting screw down, press the sleeve and the sleeve, and then return the screw. Then remove the key and screw the nut down until it comes into contact with the pressure sleeve. Then measure the width of the discharge opening. After meeting the specified requirements, clean up, top up the lubricant, and finally install the cap.
Four Edge Sealing Bag Packing Machine
Four Edge Sealing Bag Packing Machine
Four Edge Sealing Packing Machine,Automatic Bag Packing Machine,Ultrasonic Packing Machine,Powder Packaging Machine
Dongguan Pailade Machinery Equipment Co.,Ltd , https://www.pailades.com