China built the first independent research and development of deep sea oil drilling platform

The first 400-foot oil drilling platform (JU2000) in China was completed and delivered to Dalian Shipbuilding Industry Group Co., Ltd. on May 31. The drilling platform is fully automatic controlled. It can drill more than 30 wells at a time. The rated water depth is more than 100 meters, and it can be drilled at a depth of 122 meters. Its completion means that China's oil exploitation has moved from shallow sea to deep sea, which is of great significance for safeguarding China's large-scale development of offshore oil resources and implementing energy security strategies.
The international shipping industry will build high-level oil rigs as a measure of a country's shipbuilding strength. Because as a "sea island", oil rigs have to withstand any wind and wave, including 18 typhoons. In the 21st century, with the rapid rise of international oil prices, the offshore engineering market, which has been quiet for more than a decade, has become hot, and offshore drilling equipment has become a hot commodity. Although China is a large marine resource country, it is limited by mining equipment. Offshore oil development is limited to shallow water. At present, the domestic offshore oil drilling platform operates at a depth of only 80 meters and only one.
Dalian Shipbuilding Industry Group Co., Ltd. built the first 30-meter jack-up drilling platform in China in the 1970s and 1980s, and built four 100-foot-foot III-type drilling platforms and production platforms for the United States. Waiting for marine engineering. In the 1990s, the ship market continued to be sluggish. The company entered the offshore engineering market with a keen eye. After nearly seven years of market development, it formed a good momentum of shipbuilding and marine engineering. It has built two lives for Phillips. Module, built four BINGO9000 series semi-submersible drilling rigs for Norwegian OCEANRIGASA company, built the first large-tonnage offshore floating production and storage tanker in China, and for the first time in accordance with international marine engineering practices, it received the first international ocean in China. Project---Design and construction contract for 1.5 million barrels of offshore floating production and storage tanks... More than 20 years of technical reserves have made Dalian Shipbuilding Heavy Industry a leader in domestic marine engineering. In addition to the basic design of the JU2000 drilling platform delivered by the company, the core technology is completely self-developed, thus realizing the leap from the deepwater jack-up drilling platform in China.
The construction of the JU2000 drilling platform has greatly enhanced the position of China's shipbuilding industry in the international shipping industry. It is reported that this year's marine engineering will account for 30% of the sales value of Dalian Shipbuilding Heavy Industry. At present, Dalian Shipbuilding Heavy Industry holds four contracts for the same type of drilling platform. Among them, at the beginning of this year, the “Continental Shelf No. 6” drilling platform built for the US NOBLE company was signed by the Dalian Shipbuilding Heavy Work as the general contractor, which was the first time in the domestic shipyard. The rig, which operates in water depths of 10,000 feet and has a maximum drilling depth of 35,000 feet, is the world's most advanced semi-submersible rig.

PVC Coated Welded Panel

Pvc Coated Welded Panel,Pvc Coated Wire Mesh Panels,Plastic Coated Wire Fencing Panels,Plastic Coated Mesh Panels

ANPING HAOYU METAL MESH CO.,LTD. , https://www.haoyuweldedmesh.com

Posted on