Progress phase: Construction under construction (simultaneous EIA)
Construction period: March 2011 - March 2014 Major equipment: Excavators, rollers, mixing towers, pavers, cranes and other building facilities
Project Description:
The project is located on the south side of University Road, Xitang Township, Nanning. The residential land area is 98,436.9 square meters, and the total construction area is 563,871.35 square meters. The main residential construction of the project is a combination of clubhouse, commerce, farmer's market, primary school and kindergarten. The project has a total design of 4,228 households and it is expected that the total number of residents will be about 13,529. The project is planned to be divided into three districts of the central, south and south districts. The North District is a high-rise apartment complex consisting of four 26-storey apartment buildings. The middle district is a primary school and kindergarten; the southern district is located along the Wie Street shopping area and a high-rise residential area. It consists of a podium and 12 floors of 34-storey high-rise residential towers and 34-storey high-rise residential buildings.
The total project investment is unknown.
Construction Unit: Nanning Jinyu Real Estate Development Co., Ltd. Postal address: Torch Building, No. 1 Binhe Road, Nanning City Zip Code: 530007
Contact: Zhong Yu Tel
Design Unit: Guangxi Transportation Research Institute (EIA)
Postal address: No. 6 Gaoxin 2nd Road, High-tech Zone, Nanning City Zip code: 530001
Contact: Mao Zhigang Tel: 0771-2311123
Fax: 0771---2311629
Far-field Electromagnetic Wave Absorbing Tape,Far Field Electromagnetic Wave Absorbing Patchs,Far Field Electromagnetic Wave Absorbing Patch
Zhejiang Yuanbang Material Technology Co., LTD , https://www.yoboemiemc.com