Model NO.: HR5-350
Certification: Ce, RoHS, ISO, SGS
Color: Red
Mask Type: Safe-Type
Shape: Dust Mask
Trademark: huarui
Transport Package: Neutral Packing
Specification: CE
Origin: Jiangsu China
HS Code: 85159000
Hr5-350 Welding Mask and Protective Welding Glass for Safety Welding
weight | 510g |
Time from light to dark | 1/10000s |
Time from dark to light | 0.1-0.5s |
power | solar cells |
operation temperature | -5 to 55 C(23-131 F) |
Changzhou Huarui Welding & Cutting Co., LTD
Since the establishment in 1985, we have become one of the biggest manufacturers of welding and
cutting equipment and accessories in China by modern manufacturing equipment and special
technology.Â
We are specialized in manufacturing MIG, TIG, PLASMA, Welding Torches and Spare parts. With
Euro connector, Lincoln connector , Miller connector and Tweco connector, we can fit different kinds
of foreign equipments.
1.MIG Welding Torch
Binzel, Bernard, Tweco, Esab, Lincoln/Tregaskiss, Panasonic/OTC, MAXI, Kemppi, Fronius, Mechafin.
2.TIG Welding Torch
WP-24, WP-9,WP-17, WP-26, WP-20, WP-18, etc.
3.Plasma Cutting Torch
Trafimet, Cebora, Panasonic/Esab
FAQ
Q1: Can I get a samples to check the quality?
A:Sure,we can supply samples. For regular goods, the sample cost is different from the amount you
want.
For our new products, there's a MOQ of the samples.
Q2: Can I put my logo on the boxes/cartons?
A: Yes, this can be made according to your requirements, but you should send us the trademark
authorization letter.
Q3: How can you guarantee your products quality ?
A: Huarui's each torch must pass the following tests before packing: Insulation resistance test, High
voltage test, Air/Water flow test, Air/Water seal test.
If there are defective items, we usually credit to our customer or replace in the next shipment.
Q4: What's the order procedure?
A: Firstly, we discuss the details together by e-mail or TM. Then we issue you a PI for your confirmation
or Trade Assurance Order Payment Link. You will be requested to do the pre-paid full payment before
we go into the production. After we get the payment, we start to process the order. It usually takes
5-15days if we don't have the items in stock.
Ruian Leimeng locomotive parts Co., Ltd , https://www.leimenglocomotive.com