For the first time in India, solar power generation will be widely used to run the 2200 mobile tower and it will be set in nine Nasar-affected areas. The mobile tower, which will be set at a cost of 321.6 billion rupees, will operate without any support from the electricity or generators. This is the first time in India that green energy will be used for such a wide range of telecommunications towers, official sources said. Solar energy will be used to avoid electricity supply, which is irregular and interrupted in most areas. The diesel engine running generator set, in addition to the conventional fuel supply problem, also creates a lot of pollution. The technology developed by Indian manufacturers, the feed tower and solar power, in addition to the normal battery, while charging.
On August 20, the project approved by the EU cabinet was realized within one year. The Ministry of Home Affairs has been promoting the installation of mobile towers in the heavily-hit areas of Na’sar. Since 2010, due to the lack of mobile services, strong security forces have been operating and received timely help in emergency situations. Loss of some events. The lack of national telecommunication infrastructure in Jharkhand, Bihar, Chhattisgarh, Madhya Pradesh, Maharashtra, West Bengal, Orissa, Uttar Pradesh and Andhra Pradesh, Seriously affected the position of the security forces. Most towers will be located in a safe place like police stations or security forces camps so that they will not be destroyed.
FRP Grating,GRP Grating,FRP Fiberglass Stair Tread,Fiberglass Grating
Hebei aoliande Chemical Equipment Co., Ltd , https://www.aoliandechemical.com