Floor heating can prolong warm life

As floor heating becomes more and more popular in Shanghai, almost half of the owners choose to install floor heating during the renovation. With more and more installations, more and more problems have arisen. Now there are Shanghai. Fu Shan Xiao Bian to introduce you to Shanghai warm cleaning precautions:
Shanghai to warm - warm cleaning precautions.
1. The pulse cleaning machine is a high-pressure gas-water mixing device, and all parts of the fuselage must not be twisted. Otherwise, it is prone to leakage and air leakage, causing man-made machine failures.
2. When the pressure increase of the air compressor is relatively slow, it can be determined that the piston ring of the air compressor needs to be replaced. The expansion of the piston ring and cylinder gap of the air compressor will cause air compressor oil to enter the air tank and be transported to the pulse machine through the air tank, which may cause the pulser air intake control device to malfunction. At this point, the air intake control device needs to be cleaned.
3. There has been feedback on the use of floor drains to directly discharge sewage pipes. Therefore, it is strongly recommended to use a sewage buffer device at the sewage disposal end to prevent pollution from splashing when the sewage is discharged or accidents due to the quality problems of the drainage system.
4. If it is found that the discharge is not smooth during the cleaning, the inlet of the water should be stopped immediately, and solid impurities can be eliminated before cleaning.
5. If there is leakage of gas or water inside the pulse generator, please stop working. Please contact us for maintenance.
6. During the winter construction, in order to prevent the freezing of the internal pipe fittings of the machine during the outdoor transportation, please clean the internal water of the cleaning machine after construction; in the summer construction, due to the high humidity of the air, condensation may occur inside the pipe of the machine. Water is flowing out. This is normal.
7. To clean the ground during heating in winter, the ground needs 1-2 days of heat storage and heating process, and the geothermal return pipe will not become hot immediately. It should be explained to the customer correctly.

Milk Bucket

Single blanks are employed to produce parts or products with deeper shapes. Throughout the Deep Drawing process a metal blank is shaped via pressure applied by a metal die. The process could stamp and form stainless steel, brass, bronze, cold rolled steel, aluminum, copper etc.

Milk bucket is one of the many products made by deep drawing process. The deep draw process begins with metal blanks. It could be produced into various capacity, dimension, thickness and surface color.

MSG has more than 10 years of experience in Sheet Metal Fabrication, deep drawing processing. We`re glad to offer professional OEM service and technical assistance for you.

Huiye Hardware & Electrical Equipment Company Ltd. , https://www.huiyehardware.com

Posted on